Eveready Group of Spinning Mills
Home About Us Products Infrastructure Quality Contact Us
 
 

Eveready Group has been equipped with sophisticated infrastructure facilities. The group has been equipped with the state- of- the- art machineries right from the processing of cotton to yarn. Installed capacity of the group exceeds 100000 spindles and certification for "Usterised Yarn" has been recommended. The mills have testing facilities for examining the quality of procured cotton and manufactured yarn. VJ 150 TFO Machines with Rieter back processing ensures very fine quality of doubled yarn. OE Rieter BT 923 model OE Machines manufacturing premium quality yarn.

Quality being the norm of current market scenario, Eveready Group consistently maintains quality through implementing cutting- edge technologies. We continuously monitor technological innovations in the textile industry and make a positive move always, which is reflected in our ever growing customer list.

 
List of Facilities available at Eveready Spinning Mills
 Blow Room  Trumac - Truetzschler
 Carding Machine  Trumac - Truetzschler
 Drawing (RSB 851 & D 35)  Rieter
 Combers  Rieter
 Simplex  LMW
 Ring Frames  LMW
 Auto Coners  Savio / Schlafhorst
 Testing Instruments  Zellweger Uster
 Knitting  Pai Lung / Mayer and Cie
 
List of Facilities available at Mani Spinning Mills
 Blow Room  Truetzschler
 Carding Machine  Truetzschler
 Drawing (RSB 851& D 35)  LMW- Rieter
 Combers  LMW- Rieter
 Simplex  LMW
 Ring Frames  LMW
 Auto Coners  Schlafhorst
 TFO  Veejay
 Testing Instruments  Zellweger Uster
 Open End  Rieter
 
List of Facilities available at Fisher Spinning Mills
 Blendomat  Truetzschler
 Blow Room  Truetzschler
 Carding Machine  Truetzschler
 Drawing  Reiter
 Combers  Reiter
 Simplex  LMW
 Ring Frames  LMW
 Auto Coners  Muratec, Japan
 Testing Instruments  Zellweger Uster
 Yarn Conditioning  Elgi
 
Eveready Exports, a new venture started during Jan’2006, is setting up its garment manufacturing factory within the Tirupur limit.

Apart from the mentioned list of facilities the group also have 21.85 MW Windmill capacity for captive consumption